Monday, July 18, 2011

Final installation


The design is finally up! Because of the size (32m long) it took nearly two days to install, but it was worth it... It really lifts the central dining room area of the school and when the sun shines it throws shadows on the floor and brightens the sky.


Due to the stairs and the walkway at the back of the space you can see the window up close and personal. Here's a detail of the design to give you an idea of what it looks like from those vantage points.

Thanks to the help from students this has been a great project with a fantastic result.